Cold Creek Bidge Gets New Decking
The Cold Creek Bridge on the Lower Trent Trail now with improved safety thanks to the installation of new permanent, tread-safe metal decking.
The cost of replacing the decking was funded through a grant received from the Ontario Trillium Foundation.
See below and after photos of the. Work is being completed Summer 2011.
![]()

Sign posted during work construction

photo of old wooden bridge decking

Thanks to everyone for their hard work

Working on the new decking

Almost done!

Brand new safe decking
PAGE FOOTER
closes Right Content